News about our company

 Hydewa Makes History: Record-Breaking Order for Hungary Sets New Standards

A project that sets new benchmarks: Since May 2025, Hydewa has been manufacturing a total of 37,000 m² of sandwich panels with an impressive 45,000 m² of GRP surfaces for a highly automated food production facility in Hungary — starting in May 2025 and scheduled for completion by early January next year.
This order is part of one of Europe’s most significant salami and sausage production sites. It marks the largest contract in our company’s history and stands as a visible statement of what Hydewa represents: precision, reliability, and innovation — on an XXL scale.

What Makes This Project So Exceptional?

Dimension & Speed:
37,000 m² of sandwich panels — precisely scheduled, produced on time, and delivered just-in-time.

Material Expertise:
45,000 m² of GRP (glass-fiber reinforced plastic) surfaces ensure extremely high hygiene standards as well as resistance to chemicals and moisture — ideal for sensitive food production environments.

Process Reliability:
Comprehensive quality control — from production through to final assembly readiness.

A Masterclass in Teamwork – From Sales to Production

This record achievement is, above all, one thing: teamwork at Champions League level.
Our sales team secured the project through technical consulting and robust supply chain management. In production, shift models, tooling setups, and quality assurance plans were scaled up — without any compromises in tolerances or surface quality.

At the heart of coordination stands our lead project coordinator, ensuring the seamless flow of information between the client, the plant, logistics, and installation — every single day, from the first to the last truck.

“In projects of this scale, every hour and every detail counts. The fact that we can deliver so cleanly and predictably at this magnitude is the result of hard work — and a team pulling together in the same direction.”

Facts That Stand Out

37,000 m² of panels

45,000 m² of GRP surface

9-month project duration (May 2025 – January 2026, planned)

0 compromises on hygiene, tolerances, and on-time delivery

Outlook

With this flagship project, Hydewa sets new benchmarks in food and hygiene construction technology.
The experience gained — from GRP process stability to installation logistics — is already being applied to upcoming large-scale projects. Hydewa thus remains the partner that unites scalability and precision under one roof.

Hydewa mounting rail

The new, innovative mounting rail for the Hydewa renovation panel!

It offers numerous advantages and is specially designed to meet the highest demands.

See for yourself the special features that make it the ideal solution for your building project.

Strong joints, strong performance

Perfect joints - more safety, less effort

Thanks to optimized joint geometry and sanded FRP edges, you benefit from a reduced risk of injury, less sanding work and improved adhesion of the hard joint. For an even, visually appealing and durable panel system.

Hydewa Protect® – When hygiene meets toughness.

With Hydewa Protect® we are expanding our product portfolio with a pioneering solution in the field of collision protection:

Robust. Hygienic. Low maintenance. And so far unique on the market.

Extremely resistant thanks to epoxy resin core
✅ Hygienic & corrosion-free thanks to Glasbord® surface
✅ Developed for intensive use:
Whether hand pallet trucks, forklift trucks or transport racks – Hydewa Protect®protects where others give way

💡 For the food & pharmaceutical industry
💡 For the highest hygiene requirements in logistics
💡 For anyone who doesn't compromise

📢 A product that doesn't exist yet. Now available.

More info? 👉 To the product page